List of Services
















Project Gallery List /

Project Detail


Project:

Fines Retention Pond

Client:

Lafarge

Completed:

2008

Design & Construction of a system to separate the fine particles collected from the aggregates wash system to minimize the cost of fresh water supply to the wash plant.


Vertical turbine pumps installed with maintenance platform.